Alexander Deliyannis
8/2/2013 3:04 pm
22111 wrote:
This is indeed important. For the record, Brainstorm also does this kind of merge/sync out of the box, even though it is not database based. I am quite certain I read about this feature recently in a program discussed in this forum, but I can't pin it down now.
(And I can't go anywhere else to remember what it was, as I read it in this same PC in this same location...)
I forgot to mention why I mentioned Jot Merge: Because it is the only
try of my knowledge any outliner developer ever has undertaken to bring
about a solution to the age-old problem of synchronizing two different
versions of the same outline file, and that is certainly worth an
honorable mention even if it has nothing to do with the problem at hand,
all the more laudable since Jot is text file based, not database based,
where such functionality should be much easier to realize.
This is indeed important. For the record, Brainstorm also does this kind of merge/sync out of the box, even though it is not database based. I am quite certain I read about this feature recently in a program discussed in this forum, but I can't pin it down now.
(And I can't go anywhere else to remember what it was, as I read it in this same PC in this same location...)
